Wednesday, May 20, 2015

The Intermediate Bail Out Trail from Swag Drop is cut!

It's not ready to ride yet, but the corridor is cut. The old existing corridor needs to be cleaned up, the new corridor needs to be cleared, benched, cribbed and treaded.

Again, the intent of this is to provide an exit for trail users that do not wish to proceed into the Advanced section of Deception (passed Swag Drop) or ride the 3 miles back to the east trail head.

We will be blocking the old very poorly designed and unauthorized bail out below Swag Rock at the turn before the climb.


We expect this trail to be open and ready to ride by the end of the week.

No comments:

Post a Comment